Pathways to Decarbonization | Pre-War Building Comparison

This case study compares the projected performance and decarbonization pathways of two pre-war buildings in NYC. Both Building A and Building B completed Integrated Physical Needs Assessments (IPNAs) to identify energy conservation opportunities and have specified on-site solar as the major decarbonization measure. The case study analyzes the projected consumption and associated operating costs related to the proposed measures, looking at the benefits and challenges of electrifying major building systems while supplementing with on-site energy production.

Download the full Case Study to learn more.